TORQUE LOG

Seal Integrity Audit // Manassas to Mars

CYCLE: 2026-Q3
STATUS: ACTIVE

BASELINE SPECS

Pressure Differential (ΔP) ≥ 25 Pa
Leakage Rate ≤ 0.3% / sol
Bolt Pattern Star-Sequence 8pt
Target Torque 140 ft-lbs ±2%
AUDIT ID LOCATION COMPONENT TORQUE (ft-lbs) ΔP (Pa) LEAKAGE STATUS
TL-001 DOME SECTOR 4 Hatch Ring A 142.3 28.1 0.12% PASS
TL-002 DOME SECTOR 4 Hatch Ring B 138.7 26.4 0.18% PASS
TL-003 AIRLOCK PRIME Outer Bulkhead 140.1 31.2 0.09% PASS
TL-004 COURT HATCH Seal Flange 135.2 22.8 0.41% FAIL
TL-005 VINYL ARCHIVE Climate Lock 141.5 29.7 0.15% PASS
TL-006 GRILL MODULE Exhaust Valve 139.8 27.3 0.22% PASS

ACTION ITEM: TL-004

Court Hatch Seal Flange under-torqued. Re-run star-pattern sequence. Target 140 ft-lbs. Verify ΔP > 25Pa before game.